Our FACILITY

Sea-front yard at Offshore Marine Centre (OMC)

Our 200,000 sqft state of the art module Packaging facility, Certified ISO 9001,  OSHAS 18001, U-Stam, R-Stamp workshop with 5 storeys ancillary office building providing for full design, fabrication, testing and loading functions in all weather conditions. 

  • A 350m heavy loadout jetty (up to 3500 tons capacity). 
  • Close proximity to import/export international ports.
  • Close proximity to major FPSO/FSRU/MOPU conversion and newly built world-class shipyards.

 

  • Uninterrupted waterfront with depths of up to 5 meters
  • 5 Storey Office Building for Clients QA/QC & Projects Team
  • Project, Engineering and Fabrication all under “one roof”
  • Allow Effective Load Out of Heavy Lift Modules
  • Uninterrupted 350m Long Jetty For Easy Discharge